Project Overview
This project will replace aging water lines and stormwater drainage pipe. This work will improve system reliability, enhance drainage, and help reduce the risk of service disruptions.
Project Details
This project includes:
- Replacement of approximately 6,800 linear feet of 2-inch to 8-inch PVC water line to improve reliability and service
- Replacement of approximately 660 linear feet of stormwater drainage pipe
- Surface restoration following construction activities
Schedule
Projected Start Date: May 1, 2026
Projected Completion Date: Early December 2026
Projected Completion Date: Early December 2026
Public Meeting
A public meeting was held on March 19, 2026 to share project information, including scope, schedule, and anticipated impacts. Presentation slides and plan sheets from the meeting are available below for review.
Representatives
Duncan Theuri
Project Manager / City of Topeka
Tim McCormick
Construction Inspector / City of Topeka
Brandon Ramirez
Construction Manager / FIT Excavating, Inc.
Sarah White
Design Engineer / PEC
Resources
Stay Informed
Subscribe for periodic updates.
0 community members are following this project.
Public Comments
Commenting is currently closed on Topeka Speaks for this project.
No comments yet.