Project Overview
The City of Topeka is replacing approximately 1,200 linear feet of existing 6-inch water main and installing approximately 1,400 linear feet of new 6-inch water main to improve water system reliability in the area.
A public meeting was held on Monday, March 2, 2026 at The Gathering Place (4500 SW Gage Blvd.), where there was a presentation on the project.
Anticipated Project Dates: March 2026 - July 2026
A public meeting was held on Monday, March 2, 2026 at The Gathering Place (4500 SW Gage Blvd.), where there was a presentation on the project.
Anticipated Project Dates: March 2026 - July 2026