Montara Northway South Water Line Replacement
Utilities Department Water Line Replacement Project
Project Overview
The City of Topeka Utilities Department is replacing approximately 12,000 linear feet of 4-inch to 12-inch PVC water main in the Montara area shown on the map to improve system reliability and reduce the likelihood of future water main breaks.

A public meeting was held on Monday, March 16, 2026 at Hotel Topeka at City Center, where there was a presentation on the project.

Anticipated Project Start Date: August 7 
Project Duration: Up to 410 days
Location
Representatives
Duncan Theuri
Project Engineer / City of Topeka
dtheuri@topeka.org 785-368-0152
Tim McCormick
Construction Inspector / City of Topeka
tmccormick@topeka.org 785-368-2409
Alfred Toloza
Design Engineer / Alfred Benesch & Company
atoloza@benesch.com 785-409-6507
Dean Banks
Construction Manager / Mainline Contractors
dean@mainlinecontractorsinc.com 913-306-4583
Resources
Public Presentation Slides ( 23.93 MB )
Stay Informed
Subscribe for periodic updates. 0 community members are following this project.
Public Comments
Commenting is currently closed on Topeka Speaks for this project.
No comments yet.